print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all press releases

Rosseti Volga

June 26, 2020

Power engineers of Rosseti Volga are intensively preparing for winter

Specialists of the Saratov Grids branch of Rosseti Volga (a brand of IDGC of Volga, PJSC) continue preparing the power grid complex for the upcoming autumn-winter period. In the Saratov Region, within the framework of the implementation of the annual maintenance and repair program, the company's specialists completed the repair of the Zapadnaya-Agregatnaya 110 kV overhead power line (OL), I and II circuit with a branch line to the Melzavodskaya substation.

The line supplies electricity to the largest industrial enterprises and social facilities in Saratov: Saratov Polygraphic Plant JSC, Saratov Wallpaper JSC, Saratov Plant “Serp i Molot” JSC, State Health Institution “Perinatal Center”, City Park, as well as about 50 thousand residents of Kirovsky and Oktyabrsky Districts of Saratov. Specialists of the high-voltage lines service of the branch installed about 500 new PSD-70E insulators, cleaned the protection zone of OLs from trees and shrubs, replaced warning posters. All work was carried out in compliance with sanitary and epidemiological requirements.

All branches of Rosseti Volga are actively preparing for the autumn-winter period of 2020/2021. Large-scale work is carried out at substations and power lines in the Saratov, Samara, Ulyanovsk, Orenburg, Penza Regions, the Republic of Mordovia and the Chuvash Republic.

Since the beginning of the year, the company's specialists have repaired over 37.5 thousand high-voltage lines of 0.4–20 kV and 35–110 kV, as well as about 4.7 km of cable lines. In addition, power engineers replaced over 85.3 thousand insulators, repaired 5.4 thousand transformer substations and more than 900 transformers.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Coal Mining | Conglomerates | Construction Materials | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Ore Mining | Other | Other Extracting | Other Industrial | Other Service | Other Utilities | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer