The Sokol CLT plant belonging to Segezha Group (MOEX: SGZH, a
subsidiary of Sistema PJSFC) has successfully passed Conformité
Européenne certification for its cross-laminated timber (CLT)
panels. The CE certificate was obtained after a field audit performed
by employees of HolzForschung Austria, the largest Austrian wood
research and testing institute. The certificate confirms that the
enterprise has deployed modern practices to verify that the quality
of its products meets European requirements. Prior to this, CLT
panels underwent the European Technical Assessment (ETA) procedure in
the authorised laboratories at the Graz University of Technology (TUI
Graz), where detailed tests were carried out to determine the
physical and mechanical properties of the panels.
"Our plant in Sokol has once again confirmed
the high quality of its products in accordance with European
requirements. We consider this area of activity to be extremely
promising. As of today, modern technologies make it possible to
construct multi-storey buildings entirely fr om wood, and there are
such projects in Scandinavia, Europe, Canada, and the USA, wh ere
such buildings are up to 85 metres in height and have up to
27 floors. Thus far, the plant in Sokol is the only enterprise
in Russia that has confirmed the quality of its products for
multi-storey wood construction in the EU in accordance with two
standards. In the European Union, CLT panels are used for the
construction of hotels, schools, offices, and residential buildings.
As for Russia, we almost never construct multi-storey buildings from
wood. However, this is a very promising area of activity," said
Dmitry Rudenko, Vice President of Segezha Group.
The CE marking will facilitate the introduction of
Sokol CLT products to the European market. Currently, the Group
produces CLT panels only at the plant in Sokol, Vologda Region. Its
capacity is 50 thousand m3 (approximately
200 thousand m2 of housing per year). The Holding is
considering opportunities to expand its CLT production capacity
through the establishment of new enterprises in Arkhangelsk Region
(2024, 50 thousand m3) and Krasnoyarsk Krai (2026,
100 thousand m3). At the same time, the total
production capacity of the Group will increase by 4 times and reach
200 thousand m3 (approximately 800 thousand m2
of housing per year). The demand for the Company's products is
growing both in Russia and abroad.
|