print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases  TGC-9 REGISTER LOG IN

Press Releases > TGC-9  all about the company

company search
all press releases
all TGC-9 press releases

TGC-9

August 20, 2008

Power engineers are performing an overhaul with the highest capacity boiler in TGC-9 Branch “Zakamskaya CHP-5”

OJSC “TGC-9” is implementing a large-scale investment program in all its production branches. The program is directed at preparation of the stations’ equipment and heating mains for the winter period 2008-2009. In 2007 plans of TGC-9 repair campaign were fully performed that allowed to provide reliable and constant power supply during the autumn-winter period. In 2008 the new owner of the Company – IES-Holding will assign 2.5 million rubles for conducting mid-life repairs and overhauls of 52 power units, carrying out all necessary scheduled works on heating mains’ preparation.

More than 44 million rubles were directed at implementation of repair works in Zakamskaya CHP-5, which is responsible for reliable heat supply of Krasnokamsk consumers. Within the works on preparation for the winter period power engineers have performed mid-life repairs of two turbo units, broadened current maintenance of the boiler #6 and current repairs of two boilers. Besides, they have completed an overhaul of the boiler unit.

As of today power engineers have begun an overhaul of boiler #1. This is the boiler with the highest capacity at the station, its efficiency is 240 tons of steam per hour. The overhaul of the unit will enable to increase operation life. The overhaul of the boiler is supposed to be completed by September 30, 2008.

All repairs of equipment, buildings and reconstruction works at Zakamskaya CHP-5 are performed in accordance with the annual plans and schedules.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer