In January-September 2021 TGC-1 electricity output,
including JSC Murmanskaya CHPP, comprised 21,823.8 million kWh,
up by 8.51% year-on-year. CHPPs production for 9M 2021
grew by 16.4%, mainly on the back of growing demand
for electricity at the wholesale market in the North-West.
TGC-1 HPPs output grew by 0.5%. 
TGC-1 electricity output summary (million kWh) 
	
	
	
	
	
		
			
				  
			 | 
			
				9Ì 2020 
			 | 
			
				9Ì 2021 
			 | 
			
				Change 
			 | 
		 
	
	
		
			
				Nevsky branch 
			 | 
			
				11,896.1 
			 | 
			
				13,429.9 
			 | 
			
				+12.89% 
			 | 
		 
		
			
				Karelsky branch 
			 | 
			
				2,929.3 
			 | 
			
				2,933.0 
			 | 
			
				+0.13% 
			 | 
		 
		
			
				Kolsky branch 
			 | 
			
				5,277.8 
			 | 
			
				5,451.1 
			 | 
			
				+3.28% 
			 | 
		 
		
			
				TGC-1 total 
			 | 
			
				20,103.2 
			 | 
			
				21,814.0 
			 | 
			
				+8.51% 
			 | 
		 
		
			
				JSC Murmanskaya CHPP 
			 | 
			
				9.6 
			 | 
			
				9.8 
			 | 
			
				+2.08% 
			 | 
		 
		
			
				TGC-1 total, including JSC Murmanskaya CHPP 
			 | 
			
				20,112.8 
			 | 
			
				21,823.8 
			 | 
			
				+8.51% 
			 | 
		 
	
 
The volume of heat output from collectors
of TGC-1, including JSC Murmanskaya CHPP, comprised
17,258.6 thousand Gcal, which is 12.77% higher year-on-year, due
to lower ambient temperatures in January-September 2021 and
earlier heating season start in September 2021. 
TGC-1 heat output summary (thousand Gcal) 
	
	
	
	
	
		
			  
		 | 
		
			9Ì 2020 
		 | 
		
			9Ì 2021 
		 | 
		
			Change 
		 | 
	 
	
		
			Nevsky branch 
		 | 
		
			11,907.2 
		 | 
		
			13,542.4 
		 | 
		
			+13.73% 
		 | 
	 
	
		
			Karelsky branch 
		 | 
		
			1,079.5 
		 | 
		
			1,223.3 
		 | 
		
			+13.32% 
		 | 
	 
	
		
			Kolsky branch 
		 | 
		
			944.0 
		 | 
		
			1,032.5 
		 | 
		
			+9.38% 
		 | 
	 
	
		
			TGC-1 total 
		 | 
		
			13,930.7 
		 | 
		
			15,798.2 
		 | 
		
			+13.41% 
		 | 
	 
	
		
			JSC Murmanskaya CHPP 
		 | 
		
			1,373.9 
		 | 
		
			1,460.4 
		 | 
		
			+6.3% 
		 | 
	 
	
		
			TGC-1 total, including JSC Murmanskaya CHPP 
		 | 
		
			15,304.6 
		 | 
		
			17,258.6 
		 | 
		
			+12.77% 
		 | 
	 
 
For more information about the results of the
company’s production performance, please visit the Reports section
of the corporate website. 
About 
TGC-1 (part
of the Gazprom Energoholding Group) is a leading
producer and supplier of electricity and heat in the
North-West of Russia. TGC-1 comprises 52 power plants
within four constituent entities of the Russian Federation: St.
Petersburg, the Republic of Karelia, and Leningrad and Murmansk
Oblasts. 
TGC-1
installed electric capacity of the Company’s stations amounts
to 6.9 GW and heating capacity of 13.5 thous.
Gcal/hr. Major shareholders are Gazprom Energoholding LLC (51.79%)
and Fortum Power and Heat Oy (29.99%). 
 
 
 
  |