print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases  RusHydro REGISTER LOG IN

Press Releases > RusHydro  all about the company

company search
all press releases
all RusHydro press releases

RusHydro

September 24, 2009

The hydraulic jump basin crane at the Sayano-Shushenskaya HPP is re-sited on the right bank of the Yenisei

Within the scope of the current work to restore the Sayano-Shushenskaya HPP, the KBGS-1000 hydraulic jump basin crane has been re-sited.  It is now situated on the right bank of the River Yenisei in the tailrace area.  The crane has been relocated in order to minimise risks associated with the possibility of icing-up of the high-standing structures during the HPP’s operations in the autumn-winter period of 2009-2010.

The need to relocate the hydraulic jump basin crane was included in the list of measures drawn up in compliance with the recommendations made by the commission for the pre-declaration investigation at the Sayano-Shushenskaya HPP. 

Specialists of scientific-research design institutes and operating personnel of the power station are now developing a complex of measures to combat icing-up of the structures of the Sayano-Shushenskaya HPP spillway during the impending autumn-winter period.  These include mechanical removal of icing by knocking the ice of the structures, spraying of a special de-icing liquid, installation of additional surface-heating systems, etc.

It will be recalled that the commission for investigation of the Sayano-Shushenskaya HPP worked from 14 to 19 September 2009, inclusively.  It consisted of the country’s leading hydro-engineering scientists, representatives of the Lengidroproject institute and Rostekhnadzor, as well as RusHydro specialists.  According to the commission’s conclusions, the hydro-engineering structures of the Sayano-Shushenskaya HPP and the Mainsk hydro-unit are now in a working condition and a thorough examination is currently under way of the power station’s buildings and equipment.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer