print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases  Rosseti Volga REGISTER LOG IN

Press Releases > Rosseti Volga  all about the company

company search
all press releases
all Rosseti Volga press releases

Rosseti Volga

October 8, 2010

Mobile substation of IDGC of Volga, JSC having been examined by Minister of Industry and Energy of Saratov Region

Regional Minister of Industry and Energy Kirill Gorshenin visited the Agregatnaya substation where equipment overhaul is in progress. The energy facility concerned supplies power to residents of the Oktyabrsky and the Frunzensky Districts of Saratov as well as to industrial enterprises. To ensure uninterrupted consumer power supply a mobile substation was commissioned for operation during the repairs period. The substation is composed of two modules. Mounted on the first module is factory-assembled switch-gear with a 110 kV SF6 circuit breaker as well as a power transformer. Mounted on the second module is 10(6) kV switch-gear with all the control and protection systems required. The substation is equipped with systems for monitoring and remote control in the system of dispatching, ventilation, automatic heating, fire alarm and fire fighting. The complex is capable of full-value operation at temperatures from -45°Ń to +40°Ń. In case of necessity it is to be deployed for operation within 8-16 hours, allowing of prompt transportation to any of the seven activity regions of IDGC of Volga, JSC. The Company avails of two such substations located in Saratov and Samara. According to Deputy Chief Engineer of “Interregional Distribution Grid Company of Volga”, Joint-Stock Company Alexey Sofinsky, this substation is capable to ensure stable high quality power supply of 25 thousand city residents. Mobile substations are not the only example of fundamentally novel electrical engineering equipment used by the Company. IDGC of Volga, JSC was the first Russian company to purchase and actively employ for purposes of diagnostics of power cables with cross-linked polyethylene insulation an OWTS–150 mobile laboratory by Seba KMT.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer