Branch of JSC “MOESK” – Southern Electric Grids (SEG) fulfilled plan of losses for the first five months of current year. Herewith saving amounted to 16,362 ths. kWh of electric power, and losses – 672.058 mln kWh, or 12.53% with planned index of 12.83%. Due to results of production activity for 5 months of 2011 grid output amounted to 5,365.710 mln kWh, what is 3.36% more than actual grid output in comparison with the same period of the last year. Productive electric power supply for 5 months of 2011 – 4,693.652 mln kWh, what is 1.49% more than planned index and 3.32% more than actual productive electric power supply for the same period of 2010. According to Deputy Director of Southern Electric Grids for Transport of Electric Power Andrey Strel’chenko, “losses of electric power while its transportation to consumer should be, if possible, kept to minimum at expense of execution of quite a number of corresponding arrangements, including optimization of regimes of electric grids and improvement of their operation, construction, reconstruction, technical re-equipment and development of electric grids, etc. Realization of such arrangements is aimed at increase of quality and reliability of electric power supply of consumers of Moscow Region, will allow to normalize work of electric grid complex”. From the beginning of year 389 raids for determination of unaccounted and non-agreed electric power consumption were carried out in responsibility area of Southern Electric Grids. As a result 166 acts on unaccounted electric power consumption for 10,791 ths. kWh and 210 acts on non-agreed electric power consumption for 6,787 ths. kWh were drawn up. Due to acts of non-agreed consumption RUR ths. 5,698 were received on account of enterprise and 6,568 ths. kWh were included in productive supply. In frames of program on reduction of electric power losses from the beginning of year employees of branch made 140,678 readings of metered values, 6,636 check-ups of metering appliances. Replacement of 33.25 km of cable on overloaded lines to wire with larger section was carried out. Effect from execution of technical arrangements amounted to 789 ths. kWh.
|