Based on the results of the work for 2010, JSC “MOESK’s” branch High-Voltage Cable Grids assigned RUR 154 million for implementation of the repair program and thus provided 100 %-target application of the money. The major overhaul of the equipment of the systems of high pressure oil boosting of CL in ABD (autonomous burning device) #12, ABD #6, ABD #1 was held, which was stipulated by the long-term program aimed to maintain the equipment of the systems of ABD oil boosting. Repair of the construction unit, waterproofing and auxiliaries of three collectors “Troparevsky”, “TEC -23”, and “Kamushki” was performed. Repair works at auxiliaries of nine locking wells of CL 110 kV, construction unit and waterproofing of connecting wells of CL 110 kV, structures of CL of high pressure were performed. Sanitary living conditions of the production personnel of the branch were improved; the systems of security and fire signal system were repaired; the fireproof covering of cable lines in collectors was restored; metal fire-prevention doors were installed.
|