print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all TGC-9 press releases

TGC-9

May 28, 2008

In «Kizelovskaya state district power station-3», TGK-9 branch, summer repair campaign is held

Within the limits of preparation for winter the current repair of a turbogenerator and a steam boiler was finished on the power station.


JSC “TGC-9 “ carries out the scale repair program directed on the power stations equipment and thermal networks preparation for the winter period 2008-2009 in all industrial branches. Last 2007 TGC-9 repair campaign plans were executed on 100 % that allowed the company to provide reliable and uninterrupted power supply of consumers during the autumn-winter period. On repair work implementation in 2008 TGC-9 will direct more than 2,5 billion roubles for carrying out of 52 power plant capital and average repairs, all necessary procedural works implementation on thermal networks preparation.


In the summer repairs Kizelovskaya state district power station-3 plan in 2008 - boiler unit preparation hydrogenerators and turbogenerator for the winter, and also thermal networks Gubakha. In branch the station ¹15 steam boiler operating repair was finished, where audit of armature, restoration brickwork envelope, repair of the electric and mechanical equipment forced-draft fans and other works were held. Also during the steam boiler operating repair the replacement of feed water headers with restoration of isolation was executed that increased reliability of boiler unit work. By today operating repair of a turbogenerator No 9 during which cleaning of air coolers of the generator was held, the condenser of the turbine, the steam filter ejectors, filters oil cooler, repair water pivot mechanism and other works were executed. May 19, 2008 the operating repair of station ¹14 steam boiler was begun on the power station. Besides typical works on a boiler replacement steam outlet pipes of lateral screens is planned that will allow to increase reliability of the unit work.


Also from the middle of May, after the cold season finished in Gubakha city, the repair campaign in the municipal thermal networks was start which are leasable by JSC " TGC-9 " . Now works on replacement of input on CHSS ¹5 (central heat supply station) are carried out.


State district power station-3 established electric power Kizelovskiy equals 26 MWT, heat power - 326,9 Gcal/h. The main consumers of the energy developed by Kiselovskiy state district power station-3 are the industrial enterprises (including JSC "Metaphrax " and JSC « Gubakhinskiy kox »), enterprises and inhabited sector of Gubakhinskiy municipal area.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer