Alexander Ananenkov, Deputy Chairman of the Gazprom Management Committee held a meeting at the Company’s headquarters dedicated to Ladoga-32 gas-pumping units (GPU) manufacturing, testing and utilization during the Gryazovetskaya (Gazprom transgaz Ukhta) and the Vavozhskaya (Gazprom transgaz Tchaikovsky) compressor stations (CS) upgrading.
Taking part in the meeting were heads and experts from Gazprom’s specialized subdivisions and subsidiaries, as well as representatives from research and design institutes and Roselectroprom Holding.
The meeting also addressed the prospects for Ladoga-32 testing and for obtaining the initial results of the GPU operation at the Vavozhskaya and Gryazovetskaya CS.
Based on the meeting results, the specialized subdivisions were tasked to timely manufacture and test the Ladoga-32 GPU.
Background:
Roselectroprom Holding is a machine-building association dealing with R&D activities and services rendering. It comprises such prominent enterprises as Nevsky Zavod and Electropult Plant.
Roselectroprom Holding manufactures the Ladoga-32 GPU notable for a high efficiency level (36 per cent), low emissions and a long operating life as compared to other Russian industrial devices.
|