print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all Rosseti North-West press releases

Rosseti North-West

June 18, 2012

Karelenergo branch of IDGC of the North-West having reconstructed “Velikaya Guba” substation within the Kizhi Island investment project

Currently, several facilities are being constructed simultaneously.

Karelenergo branch of IDGC of the North-West, JSC is being implementing the investment project for reconstruction of the external electric power supply circuit of the Kizhi Island (Republic of Karelia).
As of the moment, reconstruction of Substation (SS) No. 78 “Velikaya Guba” has been completed within the framework of the investment project implementation.
A new substation control building (SCB) has been constructed at SS No. 78. Mounted in the SCB is equipment for control of automatic direct current, the accumulator battery, means of the automatic electric energy commercial accounting system, dispatching and process control and telemechanics. Construction and mounting works have been performed at SS No. 78 “Velikaya Guba” for installation of means for compensation for earth fault currents within the 35 kV grid (ground-fault neutralizer with automatic compensation adjustment and a 35 kV high-valued resistor). One has installed a 35 kV unit with a line circuit breaker for the 35 kV line from SS-78 “Velikaya Guba” to 35/10 kV SS ”Zharnikovo” that is currently under construction.
Apart from that, a new 10 kV two-section distribution station has been constructed in the Bolshoy Klimenetsky Island in 2011 that is fitted out with vacuum circuit breakers, security and fire alarms, video surveillance means, equipment of the automated information and measuring system of commercial energy metering, dispatcher operation control system and telemechanics.
Currently, several facilities are being constructed simultaneously. Those are the new 35/10 kV SS in the Zharnikovo village, the new 35 kV overhead line with protected wires and a fiber-optic cable from SS-78 “Velikaya Guba” to the 35/10 kV Zharnikovo village SS that is currently under construction, its extension amounting to 31.9 km.

For reference
The plan of measures for preservation of the Kizhi Pogost ensemble and development of the Kizhi open-air infrastructure development was approved of by Resolution No. 1633-r dated November 7, 2008 signed by Vladimir Putin.
Among the facilities to be constructed under the project for reconstruction of external electric power supply of the Kizhi archipelago are the 35 kV “Velikaya Guba – Zharnikovo” overhead line, the 35/10 kV SS in the Zharnikovo Village, the 10 kV underwater cable line from the 35/10 kV SS to the Kizhi Island through the Bolshoy Klimenetsky Island.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer