IDGC of Volga, JSC is completing installation of gauges for measurement of electric and thermal energy, cold and hot water and natural gas consumption for production and utility needs of the enterprise. During the current year 477 gauges will be installed at various production facilities. The amount of investment for the purpose (VAT excluded) has exceeded 8 mln RUR. 147 gauges will be installed with Penzaenergo branch, 96 – with Ulyanovsk Distribution grids, 70 – with Saratov Distribution grids, 65 – with Mordovenergo, 50 – with Chuvashenergo, 28 – with Samara Distribution grids, 21 – with Orenburgenergo. Implementation of the plans will result in improved efficiency of energy resources usage and considerable reduction of related expenditures. Thus, installation of a single thermal energy gauge results in reduction of a facility heating expenditures by 10-15%.
|