Entering of fixed assets is planned for the fourth quarter of 2011.
Branch of JSC "IDGC North-West" "Vologdaenergo" carries out the reconstruction of 35/10 kV substation "Ida" in Babushkinskiy district (Vologda region). During the reconstruction were installed the metal fences, the oil collector, was made the foundation for floodlight tower of power lines.
Currently on the site, the contractor performs the installation of the indoor distribution system 10 kV. In addition, at the new substation is carrying out the assembling of portals of outdoor distributing device 35 kV. At the substation already placed 85% of main power equipment.
Entering of fixed assets is planned for the fourth quarter of 2011. The cost of the investment project will be about 30 million rubles.
|