In the course of repair program implementation 2018, the staff of the Pravoberezhnoye PO of “Saratov Distribution Grids”, a branch of IDGC of Volga, PJSC (a member of Rosseti), repaired the 35/10 kV substation “Bobrovka”. Specialists of the substation service carried out major repair of 35 and 10 kV disconnectors, circuit breakers, 10 kV bus section and cubicles of the packaged switchgear. The current repair has been carried out at a power transformer Ò-2, an auxiliary transformer, an isolator and a short-circuiting device 35 kV, a HF stopper and a coupling capacitance. The 35/10 kV Bobrovka substation provides electricity for agricultural enterprises and mobile communication infrastructure facilities located in the territory of the Krasnoarmeysky district. Planned repair of the substation will increase the reliability of power supply to consumers and extend the life cycle of electrical equipment. Work on the implementation of the repair program in 2018 and the preparation of the grid complex of IDGC of Volga, PJSC to work in the upcoming autumn-winter period are also being conducted in other branches of the company: “Samara Distribution Grids”, “Ulyanovsk.
|