|
Nizhnekamskneftekhim | October 2, 2003 |
Ethylene pipeline systems overfulfilled a nine months plan for ethylene delivery to users
|
|
From the beginning of the year, the Ethylene Pipeline Systems of Nizhnekamskneftekhim Inc have delivered to users about 250 000 tons of ethylene, which is 101.2% compared to the same period of 2002, a nine months plan was overfulfilled by 2.8%. Right in September, the Systems delivered to users over 29 600 tons of the product. Besides, a shut-down repair was performed at the underground ethylene storage site near Salavat City in September; and sound emission diagnostics of the trunk pipeline sections are being continued.
Press Service NKNK Inc
|
|
|