Home  Issuers' Corner  Press Releases
CLOSE

Press Releases

company search
all press releases
all Rosseti Volga press releases

Rosseti Volga

November 17, 2015

Additional safety measured have been implemented at IDGC of Volga, PJSC

In order to ensure steady functioning of the power grid complex, additional safety measures have been implemented at all facilities operated by IDGC of Volga, PJSC and company branches in accordance with the instructions of the RF Ministry of Energy and Rosseti, PJSC. Power Engineers of IDGC of Volga, PJSC conduct unscheduled inspections of power equipment. All types of alarm systems and fencing, water, sewage and air ducts are inspected. Inspectors check the operation of alarm and fire extinguishing systems and preparedness of back-up power supply sources for use. Access control is improved and unscheduled staff training is conducted for drilling the actions in different emergency situations, including the threat of terrorist attack, additional cooperation is arranged with security agencies and regional divisions of Emercom of Russia. In addition, counter-terrorism training is to be conducted at the company for drilling actions in case of possible terrorist attack and cooperation with regional anti-terrorism commissions and divisions of the Federal Security Service and the Ministry of Internal Affairs.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z



Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer