print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all Rosseti Volga press releases

Rosseti Volga

August 28, 2019

Preliminary readiness inspection of production divisions for the autumn-winter period is carried out in the Chuvashenergo branch

A specially created commission of the year carried out a preliminary readiness inspection of production divisions (PD) of Rosseti Volga branch (brand of IDGC of Volga, PJSC) – Chuvashenergo to operate during the autumn-winter peak loads of 2019-2020. Members of the commission assessed the fulfillment of the necessary conditions for confirmation of readiness for AWP. In particular, compliance with the requirements of the legislation of the Russian Federation on industrial safety, the presence of production control over compliance with industrial safety requirements, including labor protection and fire safety were checked. The commission also monitored the staffing level, the availability of emergency reserve of basic equipment, the exchange collection, the necessary materials and means to perform emergency recovery works in accordance with the approved standards, as well as the availability of fire extinguishing equipment. Readiness inspection of the Chuvashenergo branch for conducting emergency and recovery works in the conditions of low temperatures, performance of the approved plan of preparation for operation in the autumn-winter period including carrying out planned repairs, and also technical survey and diagnostics of the equipment participating in ensuring passing of AWP is made. Availability of personal protective equipment, clothing, tools and so on has been also checked. Special attention is paid to the normative-technical and operational documentation. Also, the specialists of the Chuvashenergo branch developed additional measures to improve the reliability of the power system. After inspection of the divisions, the next stage has been started: assessment of the branch readiness for AWP as a whole. The result of this work should be obtaining the Winter Readiness Passport - a document confirming that the distribution power grid complex and the personnel of Chuvashenergo are ready to work during the period of maximum loads.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer