Power engineers of Mordovenergo, a branch of IDGC of Volga, PJSC (a member of Rosseti Group of Companies), take an active part in the repair campaign. In accordance with the applicable schedule, comprehensive repair of PS 110/35/10 kV Ardatov will be repaired in this September. The planned works comprise repair of power transformers of 110 kV, oil circuit breakers, isolating switches, control cabinet, several dozens of various items of electric equipment, as well as painting and improvement of the electric facility. All works are to be performed by the branch's own forces. Electric equipment repair is the scheduled work, which are carried out in accordance with the applicable repair program of the Mordovenergo branch. The taken measures also ensure trouble-free operation of electrical equipment, reliability and stability of power supply to residents of Ardatov district.
|