print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all Mechel press releases

Mechel

April 25, 2007

Mechel announces commissioning ?f shearing press at Mechel Targoviste

Targoviste , Romania – April 25, 2007, – Mechel OAO (NYSE: MTL) announces the installation and commissioning of a new shearing press in the electric arc furnace shop at its Romanian steel plant Mechel Targoviste in compliance with its technical re-equipment plan. The work has been completed in line with the current stage of Mechel Targoviste production facilities modernization program designed for the period of 2007-2011.

The shearing press is designed to process oversized metal scrap and provide steel melting works with high quality charge. This is the second shearing press installed at the plant, with the first put into operation in 2004. The new shearing press is a modern, fully automated unit, and is completely analogous to the current operating equipment in terms of its technical characteristics. Depending on the metal used for reprocessing, its production capacity ranges from 15 to 22 tonnes per hour with a cutting force of 700 tonnes. The manufacturer of the equipment, SIERRA of Italy, is among the global market leaders in manufacturing these units. The project cost is about EUR 1.0 million and the payback period of the new equipment is about five months.

With the new continuous caster put into operation this year and modernization of the mills, which lead to the blooming closure, the commissioning of the second shearing press will allow the plant to increase metal scrap density with a concurrent reduction of scrap returns. During the EAF No. 2 modernization at Mechel Targoviste in 2006, annual productivity was increased to 500 thousand tonnes. The Company plans to significantly reduce per-tonne fixed costs with a complex of technical measures aimed at further modernization of EAF No. 2, including modernization of the transformer and a change of the furnace’s operating charging baskets and steel teeming ladles, and to reach annual capacity of 600 thousand tonnes in 2008.

Due to the plant’s two-year experience in operating the first unit, it has high-class specialists and trained personnel capable to operate the new equipment, and eliminates the additional costs that would typically be necessary to train employees.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer