Home  Issuers' Corner  Press Releases
CLOSE

Press Releases

company search
all press releases
all TGC-9 press releases

TGC-9

November 9, 2006

Turbogenerator No. 5 of Sverdlovskaya HPP was transferred to the automatic control system

From now on operation of the turbine is fulfilled from the electronic module according to the specified program.

Prior hydraulic system of control had a considerable deficiency. During the synchronizing of the generator with the network deviations could reach 20-30 turns a minute. Turbine machinist with the handwheel attained the necessary characteristics. The automatic system replaced the handwheel for buttons. The staff’s labour became more comfortable – all information was shown on the display, electronics controls the necessary conditions during the launching of the turbine, follows the loads.

Reliability and accuracy of maintenance of technological characteristics of the turbine were increased - speed of rotation, steam pressure. That’s why possible peak loads won’t be a disturbance for heating of Ekaterinburg consumers.

Joint authors of powermen during the introduction of the innovation became specialists of “Uralturbo”, Sverdlovsk energy service company. The next is automation of operation of turbogenerator No.3. The production project for it has already been prepared.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z



Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer