By results of work for 9 months of 2016, the actual losses in networks of JSC "IDGC of Centre and Volga region" decreased by 12 million kWh compared to the same period last year. Reduce losses in electrical networks has been achieved through the implementation of a number of specially developed organizational and technical measures aimed at loss optimization of the grid infrastructure. These include timely reconstruction and repair of power facilities, installation of reactive power compensation at the company and consumers, replacing the old power equipment for energy efficient, increasing the capacity of transmission lines, optimization of systems of calculated and technical metering of electric energy, identifying the facts of non-contractual and unmetered electricity consumption. Moreover, in the period from January to September this year during raids, employees of energy companies together with law enforcement agencies has identified over 1200 of the facts of non-contractual electricity consumption, the amount of damages totaled approximately 103 million rubles By results of checks 52 people were brought to administrative responsibility, initiated 75 administrative proceedings and 3 criminal cases. Energomera already compensated the company for more than 51 million rubles. The remaining amount will be levied compulsorily, in a judicial order. Great importance attaches to the work of energy for the optimization of own consumption of resources for economic and production needs. In the first 9 months of 2016 through the use of energy efficient lighting, upgrading heating systems and insulation of industrial buildings and structures the energy consumption in comparison with the plan has decreased by 705 tons of conditional fuel. Electricity consumption reduced by 2.6 million kWh, natural gas by 76 thousand m3, thermal energy 2 473 Gkal, on 13 thousand m3 of reduced water consumption Recall that in the present time, IDGC of Center and Volga region implemented the Program of energy saving and energy efficiency increase, calculated for the years 2016 to 2022. Monitoring of its implementation by the Central Commission of the PJSC "IDGC of Centre and Volga region" on energy saving and reduction of losses.
|