Home  Issuers' Corner  Press Releases
CLOSE

Press Releases

company search
all press releases
all MOSENERGO (TGC-3) press releases

MOSENERGO (TGC-3)

January 16, 2003

AO MOSENERGO secures reliable power supply in load peak conditions

During the freezing temperatures occurring in December and early January power consumption in Moscow region increased 30%. However, there were no emergency situations in Mosenergo's areas of responsibility.

In December 2002, AO MOSENERGO supplied 12,790,000 GCal of heat (the average air temperature was –12.5°?). This is 765,000 more than in 2001, when the average temperature was –10.6°?.

In the second half of December, AO MOSENERGO power stations burned 1,220 mln m3 of gas. The company exceeded forecasts, using more fuel oil (by 85,000 t), Kuznetsk coal (by 190,000 t), brown coal (by 23,000 t). In December as gas supplies from Mezhregiongas decreased, AO MOSENERGO increased purchases of fuel oil and coal to maintain the provisional fuel reserves.

AO MOSENERGO ensures stable and continuous power supply for facilities in the Moscow region due to complex preparation for heating season. At the current level of preparation the system is capable of operating at –60°?.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z



Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer