Since July 2nd generating assets of TGC-9 Vorkutinskaya HPP-1, HPP-2 and Central hot-water boiling-house have been united in the aggregative branch “Vorkutinskaya HPP-2”.
Generating assets that belong to the united branch serve one industrial unit and are united by technological relationship. The installed electric power of two HPP and a boiler-house is 295 megawatt, heat power – 1015 Gkal/hour.
The establishment of aggregative central branches by territorial and technological characteristics is aimed at increase of controllability and efficiency of TGC-9 work, reduction of office and management expenses.
The appearance of a united control centre of Vorkuta territory will allow to increase reliability of energy supply of consumers. In the central branch they will solve such problems as realization of technical policy at the stations, operative and technical work and equipment maintenance, provision of labour protection and accident prevention, energy generation according to the specified operations schedule.
Since June 1st in TGC-9 has already been working the central branch in Berezniki (Perm region) that unites three generating stations.
The Board of Directors of the company also decided to establish in Sverdlovsk region aggregative branches “Ekaterinburgsky” (it will consist of Novo-Sverdlovskaya HPP, Sverdlovskaya HPP and Sverdlovsk heat networks) and “Nizhneturinsky” (Nizhneturinskaya HPP, Kachkanarskaya HPP and Verhoturskaya HPS).
|