JSC TGC-1 has announced the results of its production activities for the first half of 2013.
The production volume of electric energy generated by the company's enterprises, including JSC Murmanskaya CHPP, reached 16.3696 billion kWh over the 6 months of 2013, which is 6.5 % higher than the figures for the same period in 2012. The sales volume of electric energy on the wholesale market increased by 5.7 % to 18.7871 billion kWh, thanks to the sale of electric energy on the day-ahead market and on regulated contracts.
Aggregate data on electric energy generation of JSC TGC-1 (mln kWh)
|
6 months of 2012 |
6 months of 2013 |
Change % |
Nevsky branch |
9,802.6 |
10,604.1 |
8.2 |
Karelsky branch |
2,102.5 |
2,065.8 |
-1.7 |
Kolsky branch |
3,454.2 |
3,690.3 |
6.8 |
JSC TGC-1 |
15,359.4 |
16,360.2 |
6.5 |
JSC Murmanskaya CHPP |
9.9 |
9.4 |
-4.9 |
JSC TGC-1 including Murmanskaya CHPP |
15,369.2 |
16,369.6 |
6.5 |
According to the reporting period results, CHPP generation was fixed at a level of 9.6799 billion kWh, which is 5.9 % more than the value for first half of 2012, and HPP generation increased by 7.4 % to 6.6897 billion kWh.
In the second half of 2013, the growth in production of electric energy reached 7.5%, where growth of hydro-generation reached 4.8 % due to high water availability and growth in CHPP generation was 10.0 % due to the operations of the new CCGT-450 at Pravoberezhnaya CHPP.
Overall in the 6 months of 2013, generation by new energy units of Yuzhnaya, Pervomayskaya and Pravoberezhnaya CHPPs was 2.989 billion kWh or 18.3 % of total generation, which is 1.5 times higher than the corresponding figure for the first half of 2013. The level of specific consumption of equivalent fuel for supply of electric energy continues to demonstrate a downward trend: results from the first half of 2013 show a decrease of 2.0 %.
The utilisation coefficient of installed electrical capacity overall for JSC TGC-1 was fixed at a level of 51.8 %, which is 1.4 per cent higher than the figure for the first half of 2012.
The supply of heating energy, including JSC Murmanskaya CHPP, constituted 15.3388 million GCal, which is 1.6 % lower than the figure for the first half of 2012.
Aggregate data on the supply of heating energy of JSC TGC-1 (thousand GCal)
|
6 months of 2012 |
6 months of 2013 |
Change % |
Nevsky branch |
12,582.8 |
12,475.9 |
-0.8 |
Karelsky branch |
1,048.8 |
1,023.9 |
-2.4 |
Kolsky branch |
686.3 |
628.1 |
-8.5 |
JSC TGC-1 |
14,317.9 |
14,127.9 |
-1.3 |
JSC Murmanskaya CHPP |
1,269.7 |
1,210.9 |
-4.6 |
JSC TGC-1 including Murmanskaya CHPP |
15,587.5 |
15,338.8 |
-1.6 |
Further results on operating activities are available on the Company’s website at: https://www.tgc1.ru/ir/reports/.
|