Home  Issuers' Corner  Press Releases
CLOSE

Press Releases

company search
all press releases
all TGC-9 press releases

TGC-9

August 28, 2008

Preparing for winter power engineers pay special attention to social industrial objects

During the preparation for the autumn-winter period power engineers of TGC-9 Branch Pervouralskaya CHP took over their special control maintenance with heating resources of industrial objects connected with life support.


Power engineers completed an overhaul of the heating main linking the power station with the city plant of reinforced concrete constructions. Supply and return lines of 2.5km main section were reconstructed. So that it was provided a reliable power supply for such significant enterprises of Pervouralsk as baking and milk plants.


Preparation of power equipment for the autumn-winter maximum load is going to the end at the station. Next week they will put into operation the overhauled turbine #1. Power boiler #4 is having its scheduled maintenance. Power engineers replaced its shaft and electrical engine of smoke exhauster, covered the cables with fire protection. This special fire protection was applied for 400m of power cables in the boiler turbine shop. Intra-station objects such as masut leads, heating and gas distributive nets are also ready for winter operation.


Implementation of scheduled maintenance amounts of station equipment, heating networks, and fuel accumulation comply with the planned program for the autumn-winter period 2008-2009.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z



Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer