The stations provide heating to Ekaterinburg and its suburbs. The commission that was formed specially for it inspected there the condition of primary and auxiliary equipment, availability of fuel, spare parts and materials. They checked the instructions and knowledge of the staff. During conducting contraccident trainings they imitated a situation to check of the station staff’s actions under the limit low temperature.
“Participants of the training, - noted technical director of the company in Sverdlovsk region Leonid Solovyev, - showed quickness and good organization, having provided steadiness of the production process”.
For the fourth time chemical workshop of Novo-Sverdlovskaya HPP gets an excellent mark during the certification procedure. Their colleagues from Sverdlovsk generating station received the same excellent mark.
In October other production subdivisions of the company that work on the territory of Sverdlovsk region will receive a document about readiness for going through the autumn-winter maximum of the years 2007-2008. During this repairing campaign powermen executed works on the sum of 800,6 million RUR, it is 100 million more than last year. Their major contractors became Sverdlovsk energy service company, CES-EnergyStroyEngineering, Sverdlovelectroremont.
|