print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all MOSENERGO (TGC-3) press releases

MOSENERGO (TGC-3)

March 25, 2003

AO MOSENERGO prepares for winter period of 2003-2004

Within the framework of an overhaul campaign AO MOSENERGO plans to repair 6 power units, 24 boilers, 19 turbines and 13 water boilers. In addition, the company plans to overhaul 9 power units, 14 boilers, 8 turbines and 2 water boilers to detect and repair minor breakdowns. In 2003, AO MOSENERGO's priority task will be to install chip set regulating systems at 250 and 300 MWt turbines at GRES-4, TEZ-22 and TEZ-23. AO MOSENERGO also plans to repair boiler and replace turbine at TEZ-22.

Initially, AO MOSENERGO had planned to allocate 10.7 billion rubles for the 2003 overhaul campaign. This amount was derived from an assessment of the equipments’ condition. However, existing electricity and heating tariffs don't allow for the company to conduct a full-scale check and repair of the equipment.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer