Home  Issuers' Corner  Press Releases
CLOSE

Press Releases

company search
all press releases
all TMK press releases

TMK

April 28, 2008

TMK ships first batch of large-diameter pipes for the Kenkiyak-Kumkol pipeline

OAO TMK (TMK) announces that it began shipments of 813mm X60 large- diameter pipes with 9.5 mm wall thickness, according to API 5L, for use in the construction of the Kenkiyak-Kumkol pipeline in Kazakhstan.

 

TMK will supply 15,000 tonnes of large-diameter pipes to “Kazakhstan-China Pipeline” LLC for the period of April-June, 2008. The Kenkiyak-Kumkol pipeline is the third section of the 761 km long Kazakhstan-China Pipeline. This project will merge Kazakhstan’s main pipelines into a unified system that will be connected to Russian and Chinese pipeline networks.

 

The pipes are produced at TMK’s Volzhsky Pipe Plant.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z



Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer