Technological connection (TC) to the grids is one of the key activities of IDGC of Volga, PJSC (member of Rosseti Group). Last year, the power engineers fulfilled their obligations under 17,875 TC agreements. 564 370.9 KW of power have been provided to the consumers.
In 2017, the power engineers have provided power supply to the newly constructed housing complexes in Saratov, Engels, Samara, Togliatti, Orenburg, Saransk and Cheboksary. As part of the FIFA World Cup, the power supply of such stadiums as Samara Arena and Mordovia Arena was arranged. The additional power was given to increase reliability of operation of the airports in Saransk and Buguruslan. Solar electric plants in Saratov and Orenburg regions were connected to the electric grids. The electric power was supplied to the new health care institutions in Penza and Ulyanovsk regions. In all operating regions of IDGC of Volga, PJSC, the activities performed by the power engineers made it possible to start up new production lines at industrial and agricultural enterprises.
Effective and high quality work has been organized in IDGC of Volga, PJSC to provide a complex service of technological connection to grids with the purpose to create an option for power consumption (output) that results in actual connection of consumers’ power plants to grid facilities. User Accounts are available at the official website of the Company (www.mrsk-volgi.ru). With its help it is possible to make applications for technological connections and other services. Besides, an application for technological connection may also be submitted via Rosseti, PJSC Grid Services Portal (https://ïîðòàë-òï.ðô).
|